Project Description
YORK DISTRIBUTION CENTER
LOCATION
Glen Rock, PA
DESCRIPTION
Haines Gipson & Associates, Inc. provided engineering services in helping create the 425,000 SF industrial facility located in Glen Rock, PA.
PROJECT INFORMATION
• Construction Type – Load bearing tilt
• Clear Height – 32’
• Plan dimensions – 850’ x 498’
• Dock door bay width – 52’
ARCHITECT
Pieper O’Brien Herr
DEVELOPER
Ridgeline
GENERAL CONTRACTOR
Keystruct