DESCRIPTION
The project included a new 5800-vehicle employee parking & shuttle bus facility for Delta Airlines, on a 58 acre tract of land off of Camp Creek Parkway, in College Park, GA. Site design elements included the grading of approximately 50 acres of the site and involved moving over a million cubic yards of material on-site. A 5 lane boulevard entrance road was constructed off of Camp Creek Parkway to provide engress and egress to the facility. Also included with the entrance road improvements were the design and detailing of new left turn lanes and deceleration lanes along Camp Creek Parkway. Several areas of the site improvements were particularly challenging due to their environmental impacts. An existing stream had to be re-routed and piped through a portion of the site and the small areas of wetlands associated with the stream had to mitigated as well.
Other design components included:

  • Pavement design consisting of both flexible asphaltic concrete and rigid portland cement concrete pavement systems to support the 610 bus trips per day demand
  • Design of new fire protection and domestic water service extensions to and throughout the site, design and detailing for extension of the municipal sanitary sewer system to serve the subject property
  • Along with the design and detailing of 2 excavated storm water management ponds and the associated storm water collection and conveyance systems
  • (BMP’s) and other storm water pollution control measures to comply with the State of Georgia and City of College Park mandates