glacial ridge hospital
Glennwood, MN
Project Description:
HGA provided engineering services for a 3-story hospital addition serving as ER/OR suites.
Project Challenges:
- Basement level undermined existing foundation
- Soil nailing and helical piers required
- Operating room on 3rd floor – 7.5” composite slab for vibration control
- 15’ distances between composite beams
- Reduce slab movement on sensitive machines
- Ambulance arrival located on 2nd floor – drive into building
- Existing cast-in-place concrete structure: FRP roof for snow drift and
- FRP 2nd floor skip joist for medical records storage
Project Budget:
$10,000,000