3
span bridge over Highway 54 and the CSX
Railroad. The central span is a 220’
long steel "through truss"
design using weathering steel. The outer
end spans are precast concrete
segments. A majority of the funding
was supplied by the City of Peachtree City
with large contributions from FHWA as well
as GADOT. Construction costs including
surrounding land and roadway costs –
approx. $3,000,000.