9
span bridge over the Seaboard Railroad
that parallels I-285. The deck section was
built for 4-lane traffic with a tapered
widened segment occurring within the last
3 spans where a turn lane was necessary.
The spans are all built using precast
concrete beams. Railroad "crash
walls" were necessary for the bents
adjacent to the railline below.
Construction budget for the bridge alone -
approximately $1,500,000.